Limit Search Results
The small park in the Cheras Maluri residential area has been renovated and upgraded Adobe Acrobat 10.1.16
The small park in the Cheras Maluri residential area has been renovated and upgraded
Excerpt:
The small park in the Cheras Maluri residential area has been renovated and upgraded Adobe Acrobat
The infrastructure of Pudu Market has been greatly upgraded. The city council has allocated RM4.5 million and the construction will start this week
Excerpt:
The infrastructure of Pudu Market has been greatly upgraded. The city council has allocated RM4.5
The adjacent vacant land has been abandoned for more than 3 years and has been transformed into a pocket park for leisure
Excerpt:
The adjacent vacant land has been abandoned for more than 3 years and has been transformed into a
The road has been worn out and in disrepair for a long time. Jasmine Road in Setapak is being resurfaced
Excerpt:
The road has been worn out and in disrepair for a long time. Jasmine Road in Setapak is being
Roadside burger stall once visited by IShowSpeed has been raided Adobe Acrobat 10.1.16
Roadside burger stall once visited by IShowSpeed has been raided
Excerpt:
Roadside burger stall once visited by IShowSpeed has been raided Adobe Acrobat 10.1.16
The drain cover on Mosque Road "danced wildly" in the rain. DBKL: It has been repaired Adobe Acrobat 10.1.16
The drain cover on Mosque Road "danced wildly" in the rain. DBKL: It has been repaired
Excerpt:
The drain cover on Mosque Road "danced wildly" in the rain. DBKL: It has been repaired Adobe
95 diwali shops have been temporarily set up in five places in KL Adobe Acrobat 10.1.16
95 diwali shops have been temporarily set up in five places in KL
Excerpt:
95 diwali shops have been temporarily set up in five places in KL Adobe Acrobat 10.1.16
The pothole outside Taman Sri Endah Apartment has been repaired; Leong Ooi Kuan: You can enter and exit with peace of mind
Excerpt:
The pothole outside Taman Sri Endah Apartment has been repaired; Leong Ooi Kuan: You can enter and
Landslide in Wangsa Maju: Residents have been troubled for more than 10 years, but have no way to complain
Excerpt:
Landslide in Wangsa Maju: Residents have been troubled for more than 10 years, but have no way to
The beautification of Petaling Street is reportedly postponed to next year. The original plan was to start construction in September but no work has been done yet
Excerpt:
to start construction in September but no work has been done yet Adobe Acrobat 10.1.16
Salak South Market has been completely renovated with repairs to sinks, toilets and repainting
Excerpt:
Salak South Market has been completely renovated with repairs to sinks, toilets and repainting
Part of the "man-eating road" has been reopened and the complete restoration will be completed by the end of the year
Excerpt:
Part of the "man-eating road" has been reopened and the complete restoration will be completed by
Select an Action

