|
|
Remember to clear the cache and close the browser window.
Rooms Restriction Values
All Fields
Title
Author
Keyword in Author headings
Subject
Keyword in Subject headings
ISBN
4
Search Field
All Fields
Target Value
Limit Value
Restriction Value
Search For:
Advanced Search
Limit Search Results
Narrowed by:
+
Keywords: Terowong
Author
Include
Exclude
CamScanner
(1)
Format
Include
Exclude
Asset
(5)
Keywords
Include
Exclude
SMART,
(3)
banjir
(3)
Kuala
(2)
Lumpur,
(2)
banjir,
(2)
pengurusan
(2)
Desa,
(1)
Gamuda,
(1)
Kolam
(1)
SMART
(1)
Sistem
(1)
Smart,
(1)
Taman
(1)
bandar
(1)
berwawasan,
(1)
infrastruktur
(1)
kawalan
(1)
pembangunan
(1)
pintasan,
(1)
takungan
(1)
More
View All
Fewer
Collapse All
Media Type
Include
Exclude
Pdf Documents
(5)
Period Date
Include
Exclude
09Mei2023
(1)
12Feb2022
(1)
12Sep2020
(1)
22Dis2021
(1)
23Okt2021
(1)
Subject
Include
Exclude
Kuala Lumpur - Terowong SMART
(2)
Kuala Lumpur - Banjir
(1)
Kuala Lumpur - Isu Pembangunan Kolam Takungan Taman Desa
(1)
Kuala Lumpur - SMART
(1)
false
{sortLabel}
{alphabetical}
{relevance}
{include}
{exclude}
{facetName}
{results}
{displayName}
{count}
{error}
5 Results Found
1
Sort By:
Relevance (Default)
Publication Date (Ascending)
Publication Date (Descending)
Title
Author
00000
PKL_ASSET
Select a list
Temporary List
Make this your default list.
The following items were successfully added.
There was an error while adding the following items. Please try again.
One or more items could not be added because you are not logged in.
`Smart Tunnel mitigated situation'
`Smart Tunnel mitigated situation'
CamScanner
`Smart Tunnel mitigated situation'
http://kllibrary.dbkl.gov.my/client/en_US/search/asset/1112/0
SMART Tunnel stretched beyond the max
SMART Tunnel stretched beyond the max
SMART Tunnel stretched beyond the max
http://kllibrary.dbkl.gov.my/client/en_US/search/asset/1540/0
SMART buat pemeriksaan pintu kawalan banjir
SMART buat pemeriksaan pintu kawalan banjir
SMART buat pemeriksaan pintu kawalan banjir
http://kllibrary.dbkl.gov.my/client/en_US/search/asset/1465/0
SMART Tunnel mitigates 45% of KL floods
SMART Tunnel mitigates 45% of KL floods
SMART Tunnel mitigates 45% of KL floods
http://kllibrary.dbkl.gov.my/client/en_US/search/asset/1590/0
'Don't reduce capacity of retention pond in KL'
'Don't reduce capacity of retention pond in KL'
'Don't reduce capacity of retention pond in KL'
http://kllibrary.dbkl.gov.my/client/en_US/search/asset/2129/0
1