TSI Industrial Park at 6.5 Mile in Kepong was hit by a sudden flood, with water level reaching 6 inches
RM3.9m spent, and still not finished; Only 135 out of 159 projects completed
Nga: Old tree that killed a person is 128 years old
Launched in 2010, originally scheduled to be completed on 2024; "River of Life" might take another 8 years
Flash flood disaster in Kepong TSI Industrial Park with about half of the shops affected and goods soaked in water
‘Tebang satu, tanam semula 100 pokok’
Hari Wilayah Persekutuan 2025 mengubah generasi
DBKL introduces 10 guidelines, planning for the continued development of Kuala Lumpur