Limit Search Results
Author
Format
Language
Media Type
Publication Date
-
Subject
Switch to list view
Switch to thumbnail view
667 Results Found Subscribe to search results
000000000000PKL
Print
Flood control ponds need to be renovated for housing development, KLRA+SD urges Prime Minister to stop it
Excerpt: 
Flood control ponds need to be renovated for housing development, KLRA+SD urges Prime Minister to
The land next to the flood storage tank is planned for housing development, residents worry about impact on flood control measures
Excerpt: 
The land next to the flood storage tank is planned for housing development, residents worry about
Protect KL's flood defences
Excerpt: 
Protect KL's flood defences Adobe Acrobat 10.1.16
Ng Sze Han and Teresa Kok submitted a letter opposing the development of housing in flood control ponds
Excerpt: 
Ng Sze Han and Teresa Kok submitted a letter opposing the development of housing in flood control
Ng Sze Han: Kampung Bohol River flood control pond should maintain storage tank with regular upgrade and maintenance
Excerpt: 
Ng Sze Han: Kampung Bohol River flood control pond should maintain storage tank with regular
Factories in industrial areas frequently flood as drains clogged with garbage
Excerpt: 
Factories in industrial areas frequently flood as drains clogged with garbage Adobe Acrobat 10.1.16
TSI Industrial Park at 6.5 Mile in Kepong was hit by a sudden flood, with water level reaching 6 inches
Excerpt: 
TSI Industrial Park at 6.5 Mile in Kepong was hit by a sudden flood, with water level reaching 6
Flash flood disaster in Kepong TSI Industrial Park with about half of the shops affected and goods soaked in water
Excerpt: 
Flash flood disaster in Kepong TSI Industrial Park with about half of the shops affected and goods
The land price of the Kampung Bohol River flood control pond is calculated according to the Valuation Department formula
Excerpt: 
The land price of the Kampung Bohol River flood control pond is calculated according to the
Agencies brace for the worst :
Excerpt: 
Agencies brace for the worst : Flood relief efforts to take a different turn during pandemic
DBKL: High-rise project has met ail conditions
Excerpt: 
site," the statement further said. On flash floods, DBKL said the developer was required to pro- vide
The construction around 7 flood storage tanks is expected to cost tens of millions of ringgit and take 5 years to build
Excerpt: 
The construction around 7 flood storage tanks is expected to cost tens of millions of ringgit and