Electronic / Digital Magazine
Excerpt:
integration method makes powerful document management
possible from within any existing Oracle® business
Repair work begins at rear of Sri Lempah flats
Excerpt:
Engineering and Drainage Department's green light once the land clearing was com- pleted. Last November
DBKL resurfaces roads at Wangsa Maju flats
Excerpt:
's management committee (MC). "The roads were supposed to be handed over to the MC but it didn't happen
Paving the way for safe speed on roads in KL
Excerpt:
management interventions like road humps, roundabouts and speed table rumble strips (trans- verse bars) to
Do something about vandalism in Taman Maluri park, DBKL told
Excerpt:
Engineering department representatives, MPS Zone 17 councillor P. Mariammal and Kampung Sungai Bakau

