Limit Search Results
Author
Format
Media Type
Period Date
Switch to list view
Switch to thumbnail view
3 Results Found Subscribe to search results
000PKL_ASSET
Print
Irate over smelly clogged drains
Excerpt: 
workers opened one sump cover to remove rubble, rubbish and solidified oil/ grease, but the blockage
DBKL replaces missing drain cover in Taman Sri Endah
Excerpt: 
the task, three months after it was first reported to its one-stop hotline. DBKL explaihed that the
KL drains to be cleaned weekly to prepare for floods
Excerpt: 
's 25 flood hotspots. "Clogged drains are one of the mairi. causes of flash floods and when it rains