The haze must be stopped
Excerpt:
gallery spaces, it is his outdoor works that stand out. An important part of his work is how he contin
Residents want right turn into Taman Rainbow reinstated
Excerpt:
reinstated following its completion. "The reopening of schools has led to more traffic in the area. "It
Dicing with danger every day at Jalan Sultan Abdul Samad
Excerpt:
. they don't adhere to it and put us at risk." Devi fears for her grandchildren's safety when crossing
SMART Tunnel mitigates 45% of KL floods
Excerpt:
visionary infrastructure built 14 years ago with a sustainable, climate change solution in mind. It is
Experts: Floodwater facility may not be ideal for KL
Excerpt:
. because it would be borne by tax- payers, it was crucial that all the data was collected before going
Concerns grow over Bukit Dinding hill project
Excerpt:
natural slopes. It said drains were installed to capture and release-stormwater, adding it would
EC to bear cost of repairing two fields in Lembah Pantai
Excerpt:
contractors to carry out the repairs, or let us do it and we will bill them for the work," Mahadi told Star
Repair works at Taman Kepong KTM station to start soon
Excerpt:
Repair works at Taman Kepong KTM station to start soon
Concern over landslip-hit school wall
Excerpt:
Lumpur City Hall (DBKL), the PUblic Works Department (JKR) and the Forestry Department visiting the
Driven to tipping point
Excerpt:
areas. ,.,~,...;,,,, TheStDTSiraohic flooq mitigation. "But of course as with everything, it has to
DBKL's vital role in the development of Kuala Lumpur
Excerpt:
Either we tell ourselves it's a -local- ised event, far away in Terengganu, and it has little
Traders blocking LRT station walkway in KL
Excerpt:
lJ,it a woman. "Angry words were spoken between them, but nothing untoward happened. But what

