Limit Search Results
Media Type
Subject
Switch to list view
Switch to thumbnail view
64 Results Found Subscribe to search results
000000000000PKL
Print
Residents want right turn into Taman Rainbow reinstated
Excerpt: 
reinstated following its completion. "The reopening of schools has led to more traffic in the area. "It
SMART Tunnel mitigates 45% of KL floods
Excerpt: 
visionary infrastructure built 14 years ago with a sustainable, climate change solution in mind. It is
Resident wants DBKL to fix collapsed drain, cracked wall
Excerpt: 
caused by soil movement. ''This led to cracks forming along the wall, and it became bigger over time
The rise of KL's guardian sentinels
Excerpt: 
hosted by the Selangor Public Works Department (~WD). On April4, 1897 it was officially opened by
Concerns grow over Bukit Dinding hill project
Excerpt: 
natural slopes. It said drains were installed to capture and release-stormwater, adding it would
DBKL's vital role in the development of Kuala Lumpur
Excerpt: 
Either we tell ourselves it's a -local- ised event, far away in Terengganu, and it has little
EC to bear cost of repairing two fields in Lembah Pantai
Excerpt: 
contractors to carry out the repairs, or let us do it and we will bill them for the work," Mahadi told Star
Repair works at Taman Kepong KTM station to start soon
Excerpt: 
Repair works at Taman Kepong KTM station to start soon
Killer litter victim's mum with house problems gets no response from DBKL
Excerpt: 
Welfare Department but it has been hard," she added. Lem,bah Pantai MP Fahmi Fadzil's special officer
Concern over landslip-hit school wall
Excerpt: 
Lumpur City Hall (DBKL), the PUblic Works Department (JKR) and the Forestry Department visiting the
Driven to tipping point
Excerpt: 
areas. ,.,~,...;,,,, TheStDTSiraohic flooq mitigation. "But of course as with everything, it has to
Close brush with obstacles
Excerpt: 
. "Permanent structures are also built over drains, making it harder to clean them." The waste management