Merdeka 118 Tower still under construction and is not open to the public. The public is prohibited from entering
Land slide at Jalan Durian; Drain clogged by collapsed retaining wall   Adobe Acrobat 10.1.16
 Land slide at Jalan Durian; Drain clogged by collapsed retaining wall
 Apartment residents object to parking charges at Kepong Entrepreneurs Park commercial area
Merdeka 118 is still under construction and is closed to the public   Adobe Acrobat 10.1.16
 Merdeka 118 is still under construction and is closed to the public
Shopkeeper threatens tourists with iron bar to buy RM1632 prepaid card   Adobe Acrobat 10.1.16
 Shopkeeper threatens tourists with iron bar to buy RM1632 prepaid card
 Yee Poh Ping: Oppose the charging system for public parking spaces, which will increase the financial burden
One-way roads to ease congestion in Kepong   Adobe Acrobat 10.1.16
 One-way roads to ease congestion in Kepong
RM4.7m allocated to replace 9 elevators for PPR Pekan Kepong   Adobe Acrobat 10.1.16
 RM4.7m allocated to replace 9 elevators for PPR Pekan Kepong




