Limit Search Results
Jalan TAR closed too early in the day to be useful, say traders
Excerpt:
travel time). mobility. In the long run, Kuala Lumpur City Hall has to figure out how to transition
Taman Sri Segambut folk, shopowners fuming over lack of parking
Excerpt:
area," ne sal(l. tne road tor tne time beir:tg so further hindrance," he said. "The road and drains
It took/takes so long to get home in KL traffic
Excerpt:
, most of the time. And so it is today. TRANSFORMATIVE AND DIVISIVE The bus crawls out ofPuduraya
Five interesting buildings in KL
Excerpt:
time to time. These buildings highlight stunning architecture with a nod to contemporary designs and
Preventing unauthorised dumping
Excerpt:
non-landed-properties in Kuala Lumpur that did not prac- tise waste separation at source. The agency
'Don't reduce capacity of retention pond in KL'
Excerpt:
pushing for gazettement of the Taman Desa retention pond for a long time. "It's our biggest concern and
A truly memorable and enjoyable show at Dataran
Excerpt:
movie Mat Kilau: Kebangkitan Pahlawan, Malaysia's highest- grossing film of all time, showed up · in
Kempen Bumi Hijau Shamsuhaimie
Berita Bandaraya : Bil.4 Julai 2008
Excerpt:
at the same time they can consume fresh and quality foods . The house 's compound may also be
Mixed reaction to Jalan TAR closure on Sunday
Excerpt:
have to jostle for space and can take time deciding what we want," he said, adding . that it was
KL drains to be cleaned weekly to prepare for floods
Excerpt:
- well, hence the study is important," bags at the site for the time being he said, adding that the
EC to bear cost of repairing two fields in Lembah Pantai
Excerpt:
.constituency. This is the first time the EC had "My heart broke when I saw the season since it was always soggy
Repair works at Taman Kepong KTM station to start soon
Excerpt:
of a nearby huge bucida tree. . "Some of these extended gardens are often left neglected over time
Select an Action

