Limit Search Results
Media Type
Subject
Switch to list view
Switch to thumbnail view
173 Results Found Subscribe to search results
000000000000PKLTEST
Print
The construction site is not under construction, occupying the land for over two years without an engineering notice board, and there is no way to file a complaint
Excerpt: 
The construction site is not under construction, occupying the land for over two years without an
Lai Chen Heng: Agree with DBKL cracked down on illegal construction because it is easy to cause chaos
Excerpt: 
Lai Chen Heng: Agree with DBKL cracked down on illegal construction because it is easy to cause
Two 66-story towers to be built in outskirts ridge: Residents say 'Enough, No More Construction'
Excerpt: 
Two 66-story towers to be built in outskirts ridge: Residents say 'Enough, No More Construction'
The construction around 7 flood storage tanks is expected to cost tens of millions of ringgit and take 5 years to build
Excerpt: 
The construction around 7 flood storage tanks is expected to cost tens of millions of ringgit and
DBKL takes tough measures against illegal construction; Andre Lai Chen Heng: Support!
Excerpt: 
DBKL takes tough measures against illegal construction; Andre Lai Chen Heng: Support! Adobe Acrobat
Pasar Pudu Baharu | Business is busy, construction suspended, market upgrade to make way for the New Year
Excerpt: 
Pasar Pudu Baharu | Business is busy, construction suspended, market upgrade to make way for the
RM470,000 allocated for the construction of sports facilities and drainage
Excerpt: 
RM470,000 allocated for the construction of sports facilities and drainage Adobe Acrobat 10.1.16
RM200,000 Requested for Construction of Public Toilet in the Park
Excerpt: 
RM200,000 Requested for Construction of Public Toilet in the Park Adobe Acrobat 10.1.16
The 3rd sinkhole was a misunderstanding; It is actually a water pipe repair construction
Excerpt: 
The 3rd sinkhole was a misunderstanding; It is actually a water pipe repair construction Adobe
Residents worried that construction of commercial center will increase vehicle volume, and will worsen congestions at Jalan Vista Mutiara Satu
Excerpt: 
Residents worried that construction of commercial center will increase vehicle volume, and will
DBKL pauses construction approvals amid new geotechnical study requirement
Excerpt: 
DBKL pauses construction approvals amid new geotechnical study requirement Adobe Acrobat 10.1.16
Zaliha: Discussing the SOP for strengthening the construction of the building, including studying the geology
Excerpt: 
Zaliha: Discussing the SOP for strengthening the construction of the building, including studying
Go to:Search Results
|
Search Facets
|
Top of Page