DBKL allocates funds to build waterproof walls to prevent river flooding into campus Adobe Acrobat 10.1.16
DBKL allocates funds to build waterproof walls to prevent river flooding into campus
Kuala Lumpur Augmented Reality Art Festival kicks off with 10 locations offering exciting AR experiences
Ministry denied that DBKL increased the rent for the Deepavali bazaar Adobe Acrobat 10.1.16
Ministry denied that DBKL increased the rent for the Deepavali bazaar
The ditch collapse affects the drainage system, Jinjang Setia Road 1 and Road 5 will be flooded every time it rains
It is very dangerous for cars and people to run side by side. One of the entrances has no exit
MIBA urged DBKL to speed up the repair of the sinkhole area Adobe Acrobat 10.1.16
MIBA urged DBKL to speed up the repair of the sinkhole area
Gerai burger dikunjung IShowSpeed disita Adobe Acrobat 10.1.16
Gerai burger dikunjung IShowSpeed disita
The small park in the Cheras Maluri residential area has been renovated and upgraded Adobe Acrobat 10.1.16
The small park in the Cheras Maluri residential area has been renovated and upgraded
Roadside burger stall once visited by IShowSpeed has been raided Adobe Acrobat 10.1.16
Roadside burger stall once visited by IShowSpeed has been raided
Tiada ruang bagi pengguna LRT parkir kereta di tempat awam Adobe Acrobat 10.1.16
Tiada ruang bagi pengguna LRT parkir kereta di tempat awam
The beautification of Petaling Street has not yet started despite the construction originally scheduled to start in September
Water wall built at Gombak River tributary to solve flooding problem at Chi Man Chinese Primary School
Select an Action

