Limit Search Results
Author
Format
Media Type
Subject
Switch to list view
Switch to thumbnail view
1690 Results Found Subscribe to search results
000000000000PKLTEST
Print
SMART Tunnel mitigates 45% of KL floods
Excerpt: 
the tunnel after water diversion. The tunnel fully cleaned up after a water diversion
Seri Aman PPR residents want more transparency from DBKL
Excerpt: 
seeping into the bp.ilding, and the water pipe leak- age from inside the walls." On June 23, about 40
Kuala Lumpur hit by flash floods again
Excerpt: 
Drainage and Irrigation Depart- ment to close the tunnel. "Water from Sungai Klang/Sun- gai Am pang has
KL folk want playgrounds and facilities cleaned up
Excerpt: 
months and water has stagnated in many spots, no thanks to heavy rains. The spectators bench at
The rise of KL's guardian sentinels
Excerpt: 
healthcare facilities and improv- ing water supply for the better- ment of the public. Although the golden
Big day of celebration
Excerpt: 
Environment and Water Minister Datuk Seri Tuan Ibrahim Tuan Man. It is estimated that over 50,000 visitors
Experts: Floodwater facility may not be ideal for KL
Excerpt: 
Masjid J amek, J alan Tl.m Perak, Leboh Ampang, Jalan Melaka and nearby areas, sending water into the
Efforts underway to complete Pasar Jalan Raja Bot upgrade
Excerpt: 
likelihood of a pro- longed water supply problems at the market due to low water pres- sure in the Jalan
KL drains to be cleaned weekly to prepare for floods
Excerpt: 
not only }).ave . On plans to build an under- - proof that work has been done, but ground water
Flyover in Bangsar reopens after two-month delay
Excerpt: 
to prevent water run- off during downpours. "Reinforced walls need tb be built at sharp bends on
Overflowing with frustration
Excerpt: 
are too small (to cope with the water volume)," he explained. "The floodwater can rise up close to a
Bukit Bandaraya folks want high-rise project shelved
Excerpt: 
Charles Tan said high-rise residential project next to residents were not aware of the a water retention